Every project begins with a challenge
We do not develop standard solutions. Each case responds to specific operating conditions, combining engineering, fabrication, and field installation to address challenges of corrosion, fluid conveyance, asset protection, and operational continuity.
01
Pants duct / OTOVENT / Codelco
Process gas conveying system, in continuous 24/7 operation.
The original design fell short when operating conditions exceeded what it was designed for.

Large-format industrial duct during its fabrication process. 02
Desulfurization Tower and Receiving Tank / ENAMI
Desulfurization tower and acid product receiving tank, for the smelter’s new tail gas treatment plant.
The client requested an accelerated contract to meet the deadline of Decree 28 on gas emissions.

Lifting a cylindrical component during the assembly of the desulfurization tower. 03
Bleaching Scrubber Replacement / Celulosa Arauco
Bleaching plant scrubber, replacing the existing equipment.
The existing equipment showed advanced deterioration: severe wear of the interior chemical barrier and structural damage.

Lifting the intermediate section of the new scrubber.
Facing a particular challenge?
Let us talk about the conditions of your project and develop a solution adapted to your operation's needs.
Discuss a comparable project